Monroe Street Bridge


Replacement of single span bridge over the railroad tracks of Buffalo Pittsburgh Rail Road. Included temporary shoring (tied-back sheet pile), H-pile foundations, CIP concrete (abutments, wingwalls, deck, parapets), storm drainage system installation, roadway grading, roadway subbase and asphalt paving.

Client PennDOT Dist 10-0
StatusComplete
RolePrimary
Start1/9/2009
End4/15/2010