PA Turnpike Trafford Bridge, MP 59.58


For this job Gregori Construction and Engineering, Inc. was tasked with removing the old concrete and asphalt bridge deck and then jacking the bridge up +12" to allow for better roadway clearance on the mainline turnpike below. We then rebuilt the pedestals, reset the bridge and installed deck pans, stainless steel clad rebar and concrete for the new bridge deck. We also conducted full depth roadway repairs and paving, as well as bridge steel painting, guide rails, protective fencing and new Right of Way fencing.